Avaada, Tata Power Led Solar Installations in 1H 2022, Adani and ReNew Top Cumulatively

Avaada Tata Power Led Solar Installations in 1H 2022 Adani and ReNew Top Cumulatively

India’s installed utility-scale solar capacity breached the 50-GW mark in August 2022, 9.7 GW shy of meeting the government-set target of installing 60 GW by

The post Avaada, Tata Power Led Solar Installations in 1H 2022, Adani and ReNew Top Cumulatively appeared first on Mercom India.


Go to Source
Author: Rakesh Ranjan